Mirage Home Yamuna Expressway

3600/ - * Per . Sq . Ft

Presenting mirage homes by imperia structures

Located in Jaypee Sports City, Yamuna Expressway on the sidelines of the F1 tracks on Buddh International Circuit, Mirage Homes is a 5 acres (20234 sq. mt.) complex with 6 residential towers. All apartments are three sides open 3 BHK flats replete with lifestyle features that accentuate your everyday life to moments of zen at home and an adventurous joyride beyond it.

  • 3 BHK Apartments
  • Well ventilated Apartments
  • 3 Sides open
  • Green View Balcony
  • Abundant Natural Light
  • Vaastu Friendly design
  • On Call Service - for Laundry, Food, Grocery, Doctor etc
  • Adjoining 15.7km boulevard
  • Well Equipped Gym with Steam, Sauna & Jacuzzi
  • Restaurant
  • Infinity Edged Pool
  • Kids' Pool
  • Tennis/Basketball/Badminton Court
  • Tot-Lot
  • Snooker Room
  • Jogging Track
  • Elder's Corner
  • Musical Fountain
  • Amphitheatre
  • Texture Garden
  • Garden Of Colours
  • Garden Of Fragrance
  • Party Lawn
  • Club/Banquet
  • Mini market
  • Serene Lake View
  • Eco Friendly design
  • Pedestrian Paths and Cycle Tracks
  • Fire Suppression System
  • Multi-tier Security
  • Ample Parking Space and Visitor Parking
  • In-house Sewage Treatment Plant
  • ATM Facility
  • Separate Drop Off Area for Each Tower
  • Access Control at the entry/exit gate of the Complex
  • Rain Water Harvesting System
  • High Speed Elevators
THE LOCATION OF THE FUTURE
  • 10 mins from Night Safari
  • 20 mins from Sector 18, Noida
  • 20 mins from Noida Golf Course
  • 20 mins from proposed KP-4 Metro station
  • 20 mins from DND
  • 25 mins from Kalindi Kunj
  • 30 mins from Noida City Centre
  • 30 mins from Akshardham
  • 35 mins from South Delhi
  • Religious places like Vrindavan, Mathura just 1.5 hours away
  • Taj Mahal – 2 hours
  • Jim Corbett National Park – 4 hours
  • Gwalior – 4 hours
  • Mussoorie – 4.5 hours

UNIT PLAN:. 3 BHK + 3 TOILET (TYPE T1). SUPER AREA: 125.4 SQ. MT.

  • 1 Living Room
  • 3 Bedrooms
  • 1 Kitchen
  • 4 Balconies
  • 3 Toilets

UNIT PLAN:. 3 BHK + 3 TOILET (TYPE T2). SUPER AREA: 125.4 SQ. MT.

  • 1 Living/Dining Room
  • 3 Bedrooms
  • 1 Kitchen
  • 4 Balconies
  • 3 Toilets

UNIT PLAN:. 3 BHK + 3 TOILET + SERVANT'S ROOM (TYPE T3). SUPER AREA: 134.7 SQ. MT.

  • 1 Living/Dining Room
  • 3 Bedrooms
  • 1 Kitchen
  • 1 Servant Room
  • 2 Balconies
  • 3 Toilets

UNIT PLAN:. 3 BHK + 3 TOILET + SERVANT'S ROOM (TYPE T4). SUPER AREA: 134.7 SQ. MT.

  • 1 Living/Dining Room
  • 3 Bedrooms
  • 1 Kitchen
  • 1 Servant Room
  • 3 Balconies
  • 3 Toilets
LIVING/ DINING/ PASSAGE
Flooring Vitrified Tiles
Walls Acrylic Emulsion Paint
Ceiling Oil Bound  Distemper 
Doors Hardwood door frame with European style Flush Panel
Windows UPVC/ Powder Coated aluminum Glazing & Shutters
MASTER BEDROOM
Flooring Laminated Wooden Flooring    
Walls Acrylic Emulsion Paint
Ceiling Oil Bound Distemper
Doors Hardwood door frame with European style Flush Panel
Windows UPVC/Powder Coated aluminum Glazing & Shutters
BEDROOMS
Flooring Vitrified Tiles 
Walls Acrylic Emulsion Paint
Ceiling Oil Bound Distemper 
Doors Hardwood door frame with European style
Windows UPVC/Powder Coated aluminum Glazing & Shutters
STUDY
Flooring Vitrified Tiles    
Walls Acrylic Emulsion Paint
Ceiling Oil Bound Distemper
Doors Hardwood door frame Swith European style Flush Panel
Windows UPVC/Powder Coated aluminum Glazing & Shutters
KITCHEN
Flooring Vitrified Tiles
Walls Ceramic Tiles upto 2ft above counter with Acrylic Emulsion Paint
Ceiling Oil Bound  Distemper
Doors Hardwood door frame with European style Flush Panel  
Windows UPVC/Powder Coated aluminum Glazing & Shutters
Fixtures / Fittings / Others Granite/ Marble counter top with SS double bowl sink, CP fittings
TOILETS
Flooring Ceramic Tiles
Walls Ceramic Tiles upto 7 ft with Acrylic Emulsion
Ceiling Oil Bound Distemper
Doors Hardwood door frame with European style Flush Panel
Windows UPVC/Powder Coated aluminum Glazing & Shutters
Fixtures / Fittings / Others Granite/ Marble counters, White Chinaware , CP Fittings, Hot & Cold water supply
BALCONY/ TERRACE
Flooring Anti Skid Ceramic Tiles
Walls Exterior Paint
Fixtures / Fittings / Others Painted MS railing & handrail
S ROOM
Flooring Ceramic Tiles
Walls Oil Bound Distemper
Ceiling Oil Bound Distemper
Doors Hardwood door frame with European style Flush Panel
Windows UPVC/Powder Coated
S ROOM TOILET
Flooring Ceramic Tiles
Walls Ceramic Tiles upto 6 ft with Oil Bound Distemper
Ceiling Oil Bound Distemper
Doors Hardwood door frame with European style Flush Panel
Windows UPVC/Powder Coated aluminum Glazing & Shutters
Fixtures / Fittings / Others Conventional Fittings & WC
LIFT LOBBIES
Flooring Granite/ Imported/ Indian Marble
Walls Granite/ Indian Marble cladding around Lift entrance, Acrylic Emulsion Paint in the remaining areas
Ceiling Oil Bound Distemper
STAIRCASES
Flooring Kota Stone or Equal
Walls Oil Bound Distemper
Ceiling Oil Bound Distemper
Doors Hardwood door frame with Fire Resistant Flush Shutter
UPVC/Powder Coated aluminum Glazing & Shutters
Fixtures / Fittings / Others Concrete steps, enameled painted MS railing & handrail
EXTERNAL FAÇADE
Combination of one or more of Texture Paints/ Stone/ Paint

PAYMENT PLAN (5% NOW & AVAIL 80% LOAN, NO EMI TILL POSSESSION ) BSP @ ` 38750.40 /- SQ.MTR.)

Payment stage Payable
Booking amount 5% of COP
On Start of 18th Floor 5% of COP
ON Superstructure 5% of COP
On possession 5% of COP
*CUSTOMER WILL PAY ONLY 20% COST OF PROPERTY ( COP ). **Service Tax payable would be extra at each stage.

CONSTRUCTION LINKED PLAN

S. NO. PARTICULARS PAYMENT
01 At the time of Booking 10%
02 Within 45 Days from booking 15%
03 On start of Excavation 10%
04 On start of Basement Roof slab 8% + Car Park
05 On start of Second Floor Roof slab 8% + IDC & EDC
06 On start of Fifth Floor Roof slab 8% + PLC
07 On start of Ninth Floor Roof slab 7%
08 On start of Twelfth Floor Roof slab 7%
09 On start of Fourteen Floor Roof slab 7% + ESSC
10 On start of Sixteenth Floor Roof slab 5%
11 On start of Eighteenth Floor Roof slab 5%
12 On start of Nineteenth Floor Roof slab 5%
13 On offer of Possession Letter 5% + Club Membership + IFMS + Govt. Charges
DOWN PAYMENT PLAN
01 At the time of Booking 10%
02 Within 30 Days from Booking 85% + Car Parking + IDC & EDC + PLC + ESSC
03 On Offer of Possession 5% + Club Membership + Govt. Charges

*Upto 10% Discount On Down Payment Plan.

FLEXI PAYMENT PLAN

S. NO. PARTICULARS PAYMENT
01 At the time of Booking 10%
02 Within 30 days of booking 40% + Car Parking + IDC & EDC + PLC + ESSC
03 On casting of Basement Roof slab 9%
04 On casting of Second Floor Roof slab 9%
05 On casting of Sixth Floor Roof slab 9%
06 On casting of Twelfth Floor Roof slab 9%
07 On casting of Eighteenth Floor Roof slab 9%
08 On Offer of Possession Letter 5% + Club Membership + IFMS + Govt. Charges

*Upto 5% Discount on Flexi Payment Plan

PREFERENTIAL LOCATION CHARGES (*PER SQ.MTR. OF SUPER AREA)

S. NO. PLC TYPE AMOUNT (INR)
01 Corner 538.2 per sq. mtr.
02 Road Facing 1076.4 per sq. mtr.
03 Green Facing 538.2 per sq. mtr.
04 Club Facing 1076.4 per sq. mtr.

FLOOR PLC

S. NO. PLC TYPE AMOUNT (INR)
A G - 5TH 1076.4 per sq. mtr.
B 6th - 10th 807.3 per sq. mtr.
C 11th - 20th 538.2 per sq. mtr.
D 21st & above 1076.4 per sq. mtr.

ADDITIONAL CHARGES

PLC TYPE AMOUNT (INR)
Electric Sub-station charges 430.56/- sq. mtr.*
E.D.C/I.D.C 1345.5/- sq. mtr.
Lease Rent 538.2/- sq. mtr.
I.F.M.S 538.2/- sq. mtr.
Club Membership 1,00,000/-
Car Parking ` 2,00,000/-

PAYMENT PLAN (40:20:40) BSP @ ` 38750.40/- SQ. MTR.

Payment stage Payable
Booking amount 10% of BSP
Within 90 days from date of booking 30% of BSP
On completion of internal plaster 20% of BSP + 100% of Additional charges
On offer of possession 40% of BSP

CUSTOMER WILL PAY ONLY 2O% OF BSP ( FOR BANK FINANCE ). **Service Tax payable would be extra at each stage.

Bank loans are available from TATA CAPITAL HOUSING in subvention plan & 40:20:40 plans. AXIS, ICICI, HDFC, SBBJ are doing bank fund on CLP.

For external Maintenance, M/s Jaypee Infratech will charge a monthly amount which is not decided as yet. Therefore external maintenance advance for one year would also be charged from the buyer at the time of possession which is @ 16.146 per sq.mtr. of super area. The date from which is to be charged is finalized as maximum 90 days from the date of offer of possession.

Note:

  • Government Charges i.e. Stamp Duty, Service Tax or any other government levied charges will be extra.
  • Price can be revised without notice at the company's direction
  • Cheque's to be issued will be in favor of "Imperia Structures Ltd
  • Club Membership Mandatory
  • P.L.C. as applicable
  • 1 Sq. Mt. = 10.764 Sq. Ft.

*(Electric Sub station charges includes: Electricity Installation charges 2 kva Mandatory/Power backup 1 kva mandatory/Meter connection charges)

Featured Products

  • 14%

    Onyx Tower

    Greater Noida West,

    14% Assured Return & lease guarantee


    5250/ - * Per . Sq . Ft
  • 30%

    37th Avenue

    Gurgaon,

    30:70 Payment Plan (Pay 30% at the time booking & rest 70% on Possession)

    5100/ - * Per . Sq . Ft
  • 12%

    Wedding Mall

    Greater Noida West,

    12% Assured Return & lease guarantee


    11000/ - * Per . Sq . Ft